hide show projectinfo

TPG Post

distribution centres – 1999 / 2004

For Cepezed architects:
Assistant design phase

For Bouwteam General Contractors:
Project manager, construction management

Costs from € 500.000,- to € 3.000.000,-

Realisation of distribution centres for TPG Post by developing a construction system. Buildings with different requirements could be designed and realised in a short period of time.

Example for the programme of the Dutch government for ‘IFD bouwen’ – industrial, flexible and deconstruction design.

Requirements

Design, cost planning, composition of schedules.
Project management, tender documents, awarding of contracts, supervision of the construction, controlling of costs, completion and acceptance of construction and erection work, removal of deficiency.